cloudkms.projects.locations.key Rings.import Jobs.list
GET {{baseUrl}}/v1/:parent/importJobs?filter=<string>&orderBy=<string>&pageSize=<integer>&pageToken=<string>&$.xgafv=<string>&access_token=<string>&alt=<string>&callback=<string>&fields=<string>&key=<string>&oauth_token=<string>&prettyPrint=<boolean>"aUser=<string>&upload_protocol=<string>&uploadType=<string>
Lists ImportJobs.
Request Params
| Key | Datatype | Required | Description |
|---|---|---|---|
filter | string | Optional. Only include resources that match the filter in the response. For more information, see Sorting and filtering list results. | |
orderBy | string | Optional. Specify how the results should be sorted. If not specified, the results will be sorted in the default order. For more information, see Sorting and filtering list results. | |
pageSize | string | Optional. Optional limit on the number of ImportJobs to include in the response. Further ImportJobs can subsequently be obtained by including the ListImportJobsResponse.next_page_token in a subsequent request. If unspecified, the server will pick an appropriate default. | |
pageToken | string | Optional. Optional pagination token, returned earlier via ListImportJobsResponse.next_page_token. | |
$.xgafv | string | V1 error format. | |
access_token | string | OAuth access token. | |
alt | string | Data format for response. | |
callback | string | JSONP | |
fields | string | Selector specifying which fields to include in a partial response. | |
key | string | API key. Your API key identifies your project and provides you with API access, quota, and reports. Required unless you provide an OAuth 2.0 token. | |
oauth_token | string | OAuth 2.0 token for the current user. | |
prettyPrint | string | Returns response with indentations and line breaks. | |
quotaUser | string | Available to use for quota purposes for server-side applications. Can be any arbitrary string assigned to a user, but should not exceed 40 characters. | |
upload_protocol | string | Upload protocol for media (e.g. "raw", "multipart"). | |
uploadType | string | Legacy upload protocol for media (e.g. "media", "multipart"). |
RESPONSES
status: OK
{"importJobs":[{"attestation":{"certChains":{"caviumCerts":["deserunt anim consectetur","eiusmod laboris"],"googleCardCerts":["est Excepteur laborum exercitation anim","aliqua dolore ipsum"],"googlePartitionCerts":["pariatur","in enim eiusmod"]},"content":"sunt dolor","format":"CAVIUM_V2_COMPRESSED"},"createTime":"minim Excepteur","expireEventTime":"magna sit","expireTime":"sed elit sunt ad","generateTime":"ut Lorem id","importMethod":"RSA_OAEP_4096_SHA1_AES_256","name":"nostrud qui ipsum cillum","protectionLevel":"SOFTWARE","publicKey":{"pem":"dolore sint occaecat id in"},"state":"ACTIVE"},{"attestation":{"certChains":{"caviumCerts":["voluptate","mollit ad aute enim"],"googleCardCerts":["reprehenderit est","non Ut dolor"],"googlePartitionCerts":["eu nisi","sint aute"]},"content":"Lorem anim","format":"CAVIUM_V1_COMPRESSED"},"createTime":"irure fugiat magna","expireEventTime":"esse","expireTime":"aute nisi","generateTime":"qui officia ut commodo","importMethod":"RSA_OAEP_4096_SHA1_AES_256","name":"ullamco cupidatat","protectionLevel":"HSM","publicKey":{"pem":"sed consectetur veniam proident sit"},"state":"ACTIVE"}],"nextPageToken":"minim eiusmod","totalSize":-30386075}