cloudkms.projects.locations.key Rings.crypto Keys.list
GET {{baseUrl}}/v1/:parent/cryptoKeys?filter=<string>&orderBy=<string>&pageSize=<integer>&pageToken=<string>&versionView=<string>&$.xgafv=<string>&access_token=<string>&alt=<string>&callback=<string>&fields=<string>&key=<string>&oauth_token=<string>&prettyPrint=<boolean>"aUser=<string>&upload_protocol=<string>&uploadType=<string>
Lists CryptoKeys.
Request Params
| Key | Datatype | Required | Description |
|---|---|---|---|
filter | string | Optional. Only include resources that match the filter in the response. For more information, see Sorting and filtering list results. | |
orderBy | string | Optional. Specify how the results should be sorted. If not specified, the results will be sorted in the default order. For more information, see Sorting and filtering list results. | |
pageSize | string | Optional. Optional limit on the number of CryptoKeys to include in the response. Further CryptoKeys can subsequently be obtained by including the ListCryptoKeysResponse.next_page_token in a subsequent request. If unspecified, the server will pick an appropriate default. | |
pageToken | string | Optional. Optional pagination token, returned earlier via ListCryptoKeysResponse.next_page_token. | |
versionView | string | The fields of the primary version to include in the response. | |
$.xgafv | string | V1 error format. | |
access_token | string | OAuth access token. | |
alt | string | Data format for response. | |
callback | string | JSONP | |
fields | string | Selector specifying which fields to include in a partial response. | |
key | string | API key. Your API key identifies your project and provides you with API access, quota, and reports. Required unless you provide an OAuth 2.0 token. | |
oauth_token | string | OAuth 2.0 token for the current user. | |
prettyPrint | string | Returns response with indentations and line breaks. | |
quotaUser | string | Available to use for quota purposes for server-side applications. Can be any arbitrary string assigned to a user, but should not exceed 40 characters. | |
upload_protocol | string | Upload protocol for media (e.g. "raw", "multipart"). | |
uploadType | string | Legacy upload protocol for media (e.g. "media", "multipart"). |
RESPONSES
status: OK
{"cryptoKeys":[{"createTime":"Lorem nulla","labels":{},"name":"aliquip cupidatat occaecat","nextRotationTime":"dolor veniam","primary":{"algorithm":"RSA_DECRYPT_OAEP_3072_SHA256","attestation":{"certChains":{"caviumCerts":["amet quis voluptate aute","do dolore dolor"],"googleCardCerts":["dolor dolor","velit amet adipisicing eiusmod quis"],"googlePartitionCerts":["reprehenderit","laboris laborum reprehenderit commodo ut"]},"content":"Duis eu ea","format":"CAVIUM_V2_COMPRESSED"},"createTime":"sunt qui","destroyEventTime":"Lorem","destroyTime":"oc","externalProtectionLevelOptions":{"externalKeyUri":"\u003cstring\u003e"},"generateTime":"dolor amet ipsum enim","importFailureReason":"labore nostrud ex non","importJob":"esse ad voluptate reprehenderit id","importTime":"esse tempor","name":"e","protectionLevel":"PROTECTION_LEVEL_UNSPECIFIED","state":"\u003cstring\u003e"},"purpose":"CRYPTO_KEY_PURPOSE_UNSPECIFIED","rotationPeriod":"anim","versionTemplate":{"algorithm":"RSA_SIGN_PSS_3072_SHA256","protectionLevel":"HSM"}},{"createTime":"in voluptate do magna cupidatat","labels":{},"name":"ad nostrud","nextRotationTime":"reprehenderit ut","primary":{"algorithm":"CRYPTO_KEY_VERSION_ALGORITHM_UNSPECIFIED","attestation":{"certChains":{"caviumCerts":["nulla occaecat","nisi aliquip reprehenderit"],"googleCardCerts":["tempor Duis magna","culpa id quis"],"googlePartitionCerts":["et dolor pariatur nulla exercitation","ut culpa laborum ullamco"]},"content":"aliquip mollit","format":"CAVIUM_V1_COMPRESSED"},"createTime":"commodo adipisicing eu dolor","destroyEventTime":"dolore quis mollit","destroyTime":"mollit commodo non","externalProtectionLevelOptions":{"externalKeyUri":"\u003cstring\u003e"},"generateTime":"mini","importFailureReason":"eiusmod","importJob":"sed irure","importTime":"non incididunt elit sit","name":"ea","protectionLevel":"HSM","state":"\u003cstring\u003e"},"purpose":"ASYMMETRIC_SIGN","rotationPeriod":"dolore veniam laboris","versionTemplate":{"algorithm":"RSA_SIGN_PSS_3072_SHA256","protectionLevel":"PROTECTION_LEVEL_UNSPECIFIED"}}],"nextPageToken":"irure ex","totalSize":68276349}