cloudkms.projects.locations.key Rings.crypto Keys.update Primary Version
POST {{baseUrl}}/v1/{{name}}:updatePrimaryVersion?$.xgafv=<string>&access_token=<string>&alt=<string>&callback=<string>&fields=<string>&key=<string>&oauth_token=<string>&prettyPrint=<boolean>"aUser=<string>&upload_protocol=<string>&uploadType=<string>
Update the version of a CryptoKey that will be used in Encrypt. Returns an error if called on an asymmetric key.
Request Params
| Key | Datatype | Required | Description |
|---|---|---|---|
$.xgafv | string | V1 error format. | |
access_token | string | OAuth access token. | |
alt | string | Data format for response. | |
callback | string | JSONP | |
fields | string | Selector specifying which fields to include in a partial response. | |
key | string | API key. Your API key identifies your project and provides you with API access, quota, and reports. Required unless you provide an OAuth 2.0 token. | |
oauth_token | string | OAuth 2.0 token for the current user. | |
prettyPrint | string | Returns response with indentations and line breaks. | |
quotaUser | string | Available to use for quota purposes for server-side applications. Can be any arbitrary string assigned to a user, but should not exceed 40 characters. | |
upload_protocol | string | Upload protocol for media (e.g. "raw", "multipart"). | |
uploadType | string | Legacy upload protocol for media (e.g. "media", "multipart"). |
Request Body
{"cryptoKeyVersionId"=>"<string>"}
HEADERS
| Key | Datatype | Required | Description |
|---|---|---|---|
Content-Type | string |
RESPONSES
status: OK
{"createTime":"deserunt est","labels":{},"name":"ullamco voluptate proident enim","nextRotationTime":"qui et cupidatat sed","primary":{"algorithm":"RSA_DECRYPT_OAEP_4096_SHA256","attestation":{"certChains":{"caviumCerts":["ut proident exercitatio","aliqua ad quis"],"googleCardCerts":["Lorem et ut cillum amet","non sed cupidatat ali"],"googlePartitionCerts":["ut","aliquip veniam quis cillum minim"]},"content":"ex velit minim","format":"ATTESTATION_FORMAT_UNSPECIFIED"},"createTime":"fugiat ali","destroyEventTime":"deserunt laboris ipsum consequat","destroyTime":"magna id","externalProtectionLevelOptions":{"externalKeyUri":"\u003cstring\u003e"},"generateTime":"ut amet voluptate laboris","importFailureReason":"dolore eu aliquip ex nostrud","importJob":"Lorem","importTime":"ea ad dolor","name":"elit laborum cupidatat","protectionLevel":"EXTERNAL","state":"\u003cstring\u003e"},"purpose":"ENCRYPT_DECRYPT","rotationPeriod":"volu","versionTemplate":{"algorithm":"RSA_SIGN_PKCS1_3072_SHA256","protectionLevel":"EXTERNAL"}}