cloudkms.projects.locations.key Rings.crypto Keys.crypto Key Versions.list
GET {{baseUrl}}/v1/:parent/cryptoKeyVersions?filter=<string>&orderBy=<string>&pageSize=<integer>&pageToken=<string>&view=<string>&$.xgafv=<string>&access_token=<string>&alt=<string>&callback=<string>&fields=<string>&key=<string>&oauth_token=<string>&prettyPrint=<boolean>"aUser=<string>&upload_protocol=<string>&uploadType=<string>
Lists CryptoKeyVersions.
Request Params
| Key | Datatype | Required | Description |
|---|---|---|---|
filter | string | Optional. Only include resources that match the filter in the response. For more information, see Sorting and filtering list results. | |
orderBy | string | Optional. Specify how the results should be sorted. If not specified, the results will be sorted in the default order. For more information, see Sorting and filtering list results. | |
pageSize | string | Optional. Optional limit on the number of CryptoKeyVersions to include in the response. Further CryptoKeyVersions can subsequently be obtained by including the ListCryptoKeyVersionsResponse.next_page_token in a subsequent request. If unspecified, the server will pick an appropriate default. | |
pageToken | string | Optional. Optional pagination token, returned earlier via ListCryptoKeyVersionsResponse.next_page_token. | |
view | string | The fields to include in the response. | |
$.xgafv | string | V1 error format. | |
access_token | string | OAuth access token. | |
alt | string | Data format for response. | |
callback | string | JSONP | |
fields | string | Selector specifying which fields to include in a partial response. | |
key | string | API key. Your API key identifies your project and provides you with API access, quota, and reports. Required unless you provide an OAuth 2.0 token. | |
oauth_token | string | OAuth 2.0 token for the current user. | |
prettyPrint | string | Returns response with indentations and line breaks. | |
quotaUser | string | Available to use for quota purposes for server-side applications. Can be any arbitrary string assigned to a user, but should not exceed 40 characters. | |
upload_protocol | string | Upload protocol for media (e.g. "raw", "multipart"). | |
uploadType | string | Legacy upload protocol for media (e.g. "media", "multipart"). |
RESPONSES
status: OK
{"cryptoKeyVersions":[{"algorithm":"RSA_SIGN_PKCS1_2048_SHA256","attestation":{"certChains":{"caviumCerts":["deserunt et sint","ut officia velit laboris magna"],"googleCardCerts":["culpa qui","laboris tempor"],"googlePartitionCerts":["veniam ex aute","sit amet"]},"content":"sit consequat aliquip","format":"CAVIUM_V2_COMPRESSED"},"createTime":"deserunt velit nostrud","destroyEventTime":"Excepteur sit","destroyTime":"velit labore enim","externalProtectionLevelOptions":{"externalKeyUri":"\u003cstring\u003e"},"generateTime":"velit ut dolor","importFailureReason":"officia nisi reprehenderit in","importJob":"dolore fugiat Ut","importTime":"Ut culpa","name":"mollit elit nisi voluptate deserunt","protectionLevel":"PROTECTION_LEVEL_UNSPECIFIED","state":"\u003cstring\u003e"},{"algorithm":"RSA_SIGN_PSS_4096_SHA512","attestation":{"certChains":{"caviumCerts":["deserunt fugiat mollit consequat do","deserunt laboris in ullamco"],"googleCardCerts":["mollit nostrud sint","laboris"],"googlePartitionCerts":["laborum","sunt qui"]},"content":"in qui consequat ea","format":"CAVIUM_V1_COMPRESSED"},"createTime":"enim Lorem","destroyEventTime":"esse mollit elit in","destroyTime":"cupidatat deserunt quis","externalProtectionLevelOptions":{"externalKeyUri":"\u003cstring\u003e"},"generateTime":"Lorem dolor","importFailureReason":"irure aute","importJob":"enim ullamco ut incididunt","importTime":"dolor esse non","name":"consequat occaecat","protectionLevel":"HSM","state":"\u003cstring\u003e"}],"nextPageToken":"proident eiusmod","totalSize":-32861848}