cloudkms.projects.locations.key Rings.crypto Keys.crypto Key Versions.restore
POST {{baseUrl}}/v1/{{name}}:restore?$.xgafv=<string>&access_token=<string>&alt=<string>&callback=<string>&fields=<string>&key=<string>&oauth_token=<string>&prettyPrint=<boolean>"aUser=<string>&upload_protocol=<string>&uploadType=<string>
Restore a CryptoKeyVersion in the DESTROYSCHEDULED state. Upon restoration of the CryptoKeyVersion, state will be set to DISABLED, and destroytime will be cleared.
Request Params
| Key | Datatype | Required | Description |
|---|---|---|---|
$.xgafv | string | V1 error format. | |
access_token | string | OAuth access token. | |
alt | string | Data format for response. | |
callback | string | JSONP | |
fields | string | Selector specifying which fields to include in a partial response. | |
key | string | API key. Your API key identifies your project and provides you with API access, quota, and reports. Required unless you provide an OAuth 2.0 token. | |
oauth_token | string | OAuth 2.0 token for the current user. | |
prettyPrint | string | Returns response with indentations and line breaks. | |
quotaUser | string | Available to use for quota purposes for server-side applications. Can be any arbitrary string assigned to a user, but should not exceed 40 characters. | |
upload_protocol | string | Upload protocol for media (e.g. "raw", "multipart"). | |
uploadType | string | Legacy upload protocol for media (e.g. "media", "multipart"). |
HEADERS
| Key | Datatype | Required | Description |
|---|---|---|---|
Content-Type | string |
RESPONSES
status: OK
{"algorithm":"RSA_SIGN_PSS_4096_SHA512","attestation":{"certChains":{"caviumCerts":["ea","ex do"],"googleCardCerts":["occaecat tempor in","ad eu"],"googlePartitionCerts":["culpa eu officia quis","est proident Ut"]},"content":"voluptate Lorem irure deserunt","format":"CAVIUM_V2_COMPRESSED"},"createTime":"quis ex enim sint","destroyEventTime":"laborum sunt Lorem exercitation velit","destroyTime":"dolor","externalProtectionLevelOptions":{"externalKeyUri":"\u003cstring\u003e"},"generateTime":"labore","importFailureReason":"sed id nulla","importJob":"qui pa","importTime":"dolor ad Lorem","name":"veniam ut","protectionLevel":"SOFTWARE","state":"\u003cstring\u003e"}