cloudkms.projects.locations.key Rings.import Jobs.test Iam Permissions
POST {{baseUrl}}/v1/{{resource}}:testIamPermissions?$.xgafv=<string>&access_token=<string>&alt=<string>&callback=<string>&fields=<string>&key=<string>&oauth_token=<string>&prettyPrint=<boolean>"aUser=<string>&upload_protocol=<string>&uploadType=<string>
Returns permissions that a caller has on the specified resource. If the resource does not exist, this will return an empty set of permissions, not a NOT_FOUND error. Note: This operation is designed to be used for building permission-aware UIs and command-line tools, not for authorization checking. This operation may fail open
without warning.
Request Params
| Key | Datatype | Required | Description |
|---|---|---|---|
$.xgafv | string | V1 error format. | |
access_token | string | OAuth access token. | |
alt | string | Data format for response. | |
callback | string | JSONP | |
fields | string | Selector specifying which fields to include in a partial response. | |
key | string | API key. Your API key identifies your project and provides you with API access, quota, and reports. Required unless you provide an OAuth 2.0 token. | |
oauth_token | string | OAuth 2.0 token for the current user. | |
prettyPrint | string | Returns response with indentations and line breaks. | |
quotaUser | string | Available to use for quota purposes for server-side applications. Can be any arbitrary string assigned to a user, but should not exceed 40 characters. | |
upload_protocol | string | Upload protocol for media (e.g. "raw", "multipart"). | |
uploadType | string | Legacy upload protocol for media (e.g. "media", "multipart"). |
Request Body
{"permissions"=>["<string>", "<string>"]}
HEADERS
| Key | Datatype | Required | Description |
|---|---|---|---|
Content-Type | string |
RESPONSES
status: OK
{"permissions":["nulla ullamco laboris ut","cillum tempor eu elit"]}