cloudkms.projects.locations.list
GET {{baseUrl}}/v1/:name/locations?filter=<string>&pageSize=<integer>&pageToken=<string>&$.xgafv=<string>&access_token=<string>&alt=<string>&callback=<string>&fields=<string>&key=<string>&oauth_token=<string>&prettyPrint=<boolean>"aUser=<string>&upload_protocol=<string>&uploadType=<string>
Lists information about the supported locations for this service.
Request Params
| Key | Datatype | Required | Description |
|---|---|---|---|
filter | string | The standard list filter. | |
pageSize | string | The standard list page size. | |
pageToken | string | The standard list page token. | |
$.xgafv | string | V1 error format. | |
access_token | string | OAuth access token. | |
alt | string | Data format for response. | |
callback | string | JSONP | |
fields | string | Selector specifying which fields to include in a partial response. | |
key | string | API key. Your API key identifies your project and provides you with API access, quota, and reports. Required unless you provide an OAuth 2.0 token. | |
oauth_token | string | OAuth 2.0 token for the current user. | |
prettyPrint | string | Returns response with indentations and line breaks. | |
quotaUser | string | Available to use for quota purposes for server-side applications. Can be any arbitrary string assigned to a user, but should not exceed 40 characters. | |
upload_protocol | string | Upload protocol for media (e.g. "raw", "multipart"). | |
uploadType | string | Legacy upload protocol for media (e.g. "media", "multipart"). |
RESPONSES
status: OK
{"locations":[{"displayName":"in id nulla nisi","labels":{},"locationId":"laborum sed veniam anim","metadata":{},"name":"commodo id qui non"},{"displayName":"pariatur ipsum eu","labels":{},"locationId":"dolor","metadata":{},"name":"adipisicing pariatur laborum"}],"nextPageToken":"eiusm"}