Boilerplates
GET {{base_url}}/boilerplate
NOTE: The Boilerplate hub requires that your Vantagepoint application has the CRM Plus module installed.
Use this endpoint to retrieve all boilerplates that are currently in the Boilerplates hub.
Request Params
Key | Datatype | Required | Description |
---|---|---|---|
limit | string | Optional. |
The limit for the number of results to return.
If you want to only retrieve a subset of all records, use this to limit the number of records that will be returned. |
HEADERS
Key | Datatype | Required | Description |
---|---|---|---|
Content-Type | string | Required. |
The type of content supported by the API endpoint. |
| Authorization
| string | | Required.
The type of authorization supported by the API endpoint. |
RESPONSES
status: OK
[{"Name":"Campus Security","Description":"","Document":"","CustomCurrencyCode":"USD","DisplayName":"Campus Security","CreateUser":"","CreateDate":"2004-09-14T17:17:43.000","ModUser":"Brenda Gray, PE","ModDate":"2017-05-26T17:12:20.197","CustName":"","CustProject":"","desc_CustProject":"","CustResponsibleContact":"","desc_CustResponsibleContact":"","CustNote":"","CustResponsible":"","desc_CustResponsible":"","CustFollowup":"N","CustomTest":0},{"Name":"Computer Support","Description":"CADD Services","Document":"\u003cFONT face=Arial size=3\u003e\u003c/FONT\u003e\n\u003cP class=MsoNormal\u003e\u003cFONT face=Arial\u003e\u003cFONT size=3\u003e\u003cB\u003e\u003cI\u003eCAD Services:\u003cSPAN style=\"mso-spacerun: yes\"\u003e\u0026nbsp; \u003c/SPAN\u003e\u003c/I\u003e\u003c/B\u003eSmith \u0026amp; Johnson Associates maintains an array of Computer Aided Design (CAD) capabilities.\u003cSPAN style=\"mso-spacerun: yes\"\u003e\u0026nbsp; \u003c/SPAN\u003eUsing state-of-the-art work stations and the latest in programming technology, we can produce high-quality design and work drawings and specifications in an accelerated time frame.\u003cSPAN style=\"mso-spacerun: yes\"\u003e\u0026nbsp; \u003c/SPAN\u003eThe CAD system is used from early design development through construction drawings where applicable.\u003cSPAN style=\"mso-spacerun: yes\"\u003e\u0026nbsp; \u003c/SPAN\u003eOnly specific detailing may be left to traditional hand-drafting techniques.\u003c/FONT\u003e\u003c/FONT\u003e \u003c/P\u003e\u003cSPAN style=\"FONT-SIZE: 12pt; FONT-FAMILY: 'Times New Roman'; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-US; mso-fareast-language: EN-US; mso-bidi-language: AR-SA\"\u003e\u003cFONT face=Arial\u003eThe firm also has access to and utilizes a variety of computerized project management, cost estimating, and specification development systems.\u003cSPAN style=\"mso-spacerun: yes\"\u003e\u0026nbsp; \u003c/SPAN\u003eThese systems are used throughout the firm to ensure accuracy and consistency in all design and estimating tasks.\u003c/FONT\u003e \u003c/SPAN\u003e","CustomCurrencyCode":"USD","DisplayName":"Computer Support","CreateUser":"","CreateDate":"2007-06-19T11:27:25.000","ModUser":"Brenda Gray, PE","ModDate":"2017-05-31T07:50:26.340","CustName":"","CustProject":"","desc_CustProject":"","CustResponsibleContact":"","desc_CustResponsibleContact":"","CustNote":"","CustResponsible":"","desc_CustResponsible":"","CustFollowup":"Y","CustomTest":0},{"Name":"Firm History","Description":"Apple \u0026 Bartlett Detailed Firm History","Document":"\u003cp class=\"MsoNormal\"\u003e\u003cspan style=\"font-family:Arial; font-size:medium\"\u003eApple \u0026amp; Bartlett was founded in 1965 and is one of the premier full-service firms.\u003cspan style=\"mso-spacerun:yes\"\u003e\u0026nbsp; \u003c/span\u003eOur areas of expertise include award-winning projects in the areas of health-care, commercial development, retail, laboratories, wastewater treatment, roads, bridges, schools, industrial parks, laboratories, gardens, master planning.\u003c/span\u003e\u003c/p\u003e\n\n\u003cp class=\"MsoNormal\"\u003e\u0026nbsp;\u003c/p\u003e\n\n\u003cp class=\"MsoNormal\"\u003e\u003cspan style=\"font-family:Arial; font-size:medium\"\u003eApple \u0026amp; Bartlett LLC employees cost control techniques, allowing managers to establish an accurate project budget, and design to this budget as evidenced by the low bid amount found in most of the firm\u0026#39;s projects.\u003c/span\u003e\u003c/p\u003e\n\n\u003cp class=\"MsoNormal\"\u003e\u003cspan style=\"font-family:Arial; font-size:medium\"\u003eTo manage our project budgets, we have developed an internal method of cost modeling.\u003cspan style=\"mso-spacerun:yes\"\u003e\u0026nbsp; \u003c/span\u003eOnce the client\u0026#39;s project program is finalized and the conceptual design is approved, we prepare a cost model package broadly outlining each phase and aspect of the project.\u003cspan style=\"mso-spacerun:yes\"\u003e\u0026nbsp; \u003c/span\u003eThis cost model yields a pricing package which forms the basis for the discussion of the project budget with the client.\u003cspan style=\"mso-spacerun:yes\"\u003e\u0026nbsp; \u003c/span\u003eAt the conclusion of the cost-modeling process, a project budget is established. The project budget is continually reviewed at each phase of the project development to ensure accuracy in accordance with the cost model.\u003c/span\u003e\u003c/p\u003e\n\n\u003cp class=\"MsoNormal\"\u003e\u003cspan style=\"font-family:Arial; font-size:medium\"\u003eThe identification of land-use patterns will provide insights into the future development of the complex.\u003cspan style=\"mso-spacerun:yes\"\u003e\u0026nbsp; \u003c/span\u003eExisting open-space, pedestrian and vehicular movement patterns and service locations, will be analyzed with regard to total campus development.\u003c/span\u003e\u003c/p\u003e\n\n\u003cp class=\"MsoNormal\"\u003e\u003cspan style=\"font-family:Arial; font-size:medium\"\u003eApple \u0026amp; Bartlett LLC employees cost control techniques, allowing managers to establish an accurate project budget, and design to this budget as evidenced by the low bid amount found in most of the firm\u0026#39;s projects.\u003c/span\u003e\u003c/p\u003e\n\n\u003cp class=\"MsoNormal\"\u003e\u003cspan style=\"font-family:Arial; font-size:medium\"\u003eTo manage our project budgets, we have developed an internal method of cost modeling.\u003cspan style=\"mso-spacerun:yes\"\u003e\u0026nbsp; \u003c/span\u003eOnce the client\u0026#39;s project program is finalized and the conceptual design is approved, we prepare a cost model package broadly outlining each phase and aspect of the project.\u003cspan style=\"mso-spacerun:yes\"\u003e\u0026nbsp; \u003c/span\u003eThis cost model yields a pricing package which forms the basis for the discussion of the project budget with the client.\u003cspan style=\"mso-spacerun:yes\"\u003e\u0026nbsp; \u003c/span\u003eAt the conclusion of the cost-modeling process, a project budget is established. The project budget is continually reviewed at each phase of the project development to ensure accuracy in accordance with the cost model.\u003c/span\u003e\u003c/p\u003e\n\n\u003cp\u003e\u003cspan style=\"font-family:'Times New Roman'; font-size:12pt; mso-ansi-language:EN-US; mso-bidi-language:AR-SA; mso-fareast-font-family:'Times New Roman'; mso-fareast-language:EN-US\"\u003e\u003cspan style=\"font-family:Arial\"\u003eThe identification of land-use patterns will provide insights into the future development of the complex.\u003cspan style=\"mso-spacerun:yes\"\u003e\u0026nbsp; \u003c/span\u003eExisting open-space, pedestrian and vehicular movement patterns and service locations, will be analyzed with regard to total campus development.\u003c/span\u003e \u003c/span\u003e\u003c/p\u003e","CustomCurrencyCode":"USD","DisplayName":"Firm History","CreateUser":"Steve Anderson, AIA","CreateDate":"2007-06-19T11:39:12.000","ModUser":"Brenda Gray, PE","ModDate":"2017-10-26T14:17:47.247","CustName":"","CustProject":"","desc_CustProject":"","CustResponsibleContact":"","desc_CustResponsibleContact":"","CustNote":"","CustResponsible":"","desc_CustResponsible":"","CustFollowup":"N","CustomTest":0},{"Name":"Firm History - Brief","Description":"Apple \u0026 Bartlett Firm History","Document":"\u003cP\u003e\u003cSPAN style=\"FONT-SIZE: 12pt; FONT-FAMILY: 'Times New Roman'; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-US; mso-fareast-language: EN-US; mso-bidi-language: AR-SA\"\u003e\u003cFONT face=Arial\u003eApple \u0026amp; Bartlett was founded in 1965 and is one of the premier full-service firms.\u003cSPAN style=\"mso-spacerun: yes\"\u003e\u0026nbsp; \u003c/SPAN\u003eOur areas of expertise include award-winning projects in the areas of health-care, commercial development, retail, laboratories, wastewater treatment, roads, bridges, schools, industrial parks, laboratories, gardens, master planning.\u003c/FONT\u003e\u003c/SPAN\u003e\u003c/P\u003e","CustomCurrencyCode":"USD","DisplayName":"Firm History - Brief","CreateUser":"Steve Anderson, AIA","CreateDate":"2007-06-19T11:46:31.000","ModUser":"Steve Anderson, AIA","ModDate":"2007-06-19T11:46:31.000","CustName":"","CustProject":"","desc_CustProject":"","CustResponsibleContact":"","desc_CustResponsibleContact":"","CustNote":"","CustResponsible":"","desc_CustResponsible":"","CustFollowup":"N","CustomTest":0},{"Name":"Past Performance","Description":"Performance History for Environmental Services","Document":"\u003cP class=MsoNormal\u003e\u003cFONT face=Arial size=3\u003eApple \u0026amp; Bartlett LLC employees cost control techniques, allowing managers to establish an accurate project budget, and design to this budget as evidenced by the low bid amount found in most of the firm's projects.\u003c/FONT\u003e \u003c/P\u003e\n\u003cP class=MsoNormal\u003e\u003cFONT face=Arial size=3\u003eTo manage our project budgets, we have developed an internal method of cost modeling.\u003cSPAN style=\"mso-spacerun: yes\"\u003e\u0026nbsp; \u003c/SPAN\u003eOnce the client's project program is finalized and the conceptual design is approved, we prepare a cost model package broadly outlining each phase and aspect of the project.\u003cSPAN style=\"mso-spacerun: yes\"\u003e\u0026nbsp; \u003c/SPAN\u003eThis cost model yields a pricing package which forms the basis for the discussion of the project budget with the client.\u003cSPAN style=\"mso-spacerun: yes\"\u003e\u0026nbsp; \u003c/SPAN\u003eAt the conclusion of the cost-modeling process, a project budget is established. The project budget is continually reviewed at each phase of the project development to ensure accuracy in accordance with the cost model.\u003c/FONT\u003e \u003c/P\u003e\u003cSPAN style=\"FONT-SIZE: 12pt; FONT-FAMILY: 'Times New Roman'; mso-fareast-font-family: 'Times New Roman'; mso-ansi-language: EN-US; mso-fareast-language: EN-US; mso-bidi-language: AR-SA\"\u003e\u003cFONT face=Arial\u003eThe identification of land-use patterns will provide insights into the future development of the complex.\u003cSPAN style=\"mso-spacerun: yes\"\u003e\u0026nbsp; \u003c/SPAN\u003eExisting open-space, pedestrian and vehicular movement patterns and service locations, will be analyzed with regard to total campus development.\u003c/FONT\u003e \u003c/SPAN\u003e","CustomCurrencyCode":"USD","DisplayName":"Past Performance","CreateUser":"Steve Anderson, AIA","CreateDate":"2007-06-19T11:31:52.000","ModUser":"Steve Anderson, AIA","ModDate":"2007-06-19T11:32:33.000","CustName":"","CustProject":"","desc_CustProject":"","CustResponsibleContact":"","desc_CustResponsibleContact":"","CustNote":"","CustResponsible":"","desc_CustResponsible":"","CustFollowup":"N","CustomTest":0}]